• Projects

what is going on in the stables?

01.12.2022

Tests to determine the load-bearing capacity

In the last few days, load tests have been carried out in a stable building to check the load-bearing capacity of the ceilings and construction. Gravel is pumped onto the ceiling, which is secured by temporary shims, and the load-bearing capacity is tested using a special calculation. Afterwards, the gravel is taken out of the building again and the original condition is restored.  The tests have been implemented in coordination with the trotting club. 

We regret that this has resulted in increased noise - the tests have already been completed & the gravel will be removed by noon tomorrow at the latest.

Your Live Dabei!-Team